AS9102
First Article Report
Customer-approved forms or system, characteristic map, measured results, and applicable material, process, and test evidence—defined from the released scope.
Request a sampleHome › Quality & Inspection
Zeiss Contura · Quoted AS9102-format FAIDatums · Probing · Documentation
Tight prints don't get held by intuition. They get held by datums, probing, and a defined inspection plan documented before the first chip flies.
Start a commercial RFQCertification roadmap
Procut-CNC is not currently certified to AS9100D, ISO 9001, or ISO 13485. AS9100D implementation is underway. No certification audit is currently scheduled. Draft QMS documents and registers are being prepared for owner approval, employee training, and authentic operating records.
A lean AS9100D manual, registers, and go-live controls are in preparation. Owner approval and employee training are still required before the system becomes effective.
IN PROGRESS
The shop must first create authentic operating evidence, then complete and close a full internal audit against the implemented AS9100D system.
NOT STARTED
Certification-body quotations and scheduling follow owner confirmation of the scope, site, headcount, and target timing. No registrar has been selected and no audit is currently scheduled.
NOT SCHEDULED
Stage 2 follows Stage 1 readiness and closure of applicable findings. Certification depends on the independent certification body's audit and decision.
NOT SCHEDULED
Inspection floor
Measurement-equipment inventory and records are being reconciled during AS9100D implementation. Equipment without verified current status and supporting evidence is not authorized for product acceptance. Applicable current records are available by arrangement after verification.
Flexible probing for complex geometry and tapered features. Acceptance use depends on verified system status, configuration, environment, method, and supporting records.
Image-dimension measurement system — high-throughput dimensional checks on small/medium parts.
Optical comparator for profile, threads, and 2D feature verification.
Digital height gage for repeatable Z-axis measurement at the machine.
In-machine work + tool probing on UMC and VF-4SS — catches drift between operations.
Ra / Rz verification for medical and aerospace surface-finish callouts.
Gage blocks, micrometers, calipers, and indicators; each device's current status is verified before product-acceptance use.
Rockwell hardness and positive-material-ID can be quoted through a verified sub-tier when required.
Inspection plan
Before we cut, an engineer reviews GD&T, picks the datum scheme, and writes the inspection plan.
Applicable design characteristics are verified with methods suited to the governing requirements. AS9102-format documentation and supporting records are scoped by quote.
Probing on critical features mid-run, sampled CMM at planned intervals, and inspection frequency defined by the drawing, customer, and quality plan. 100% verification is available when required.
Documentation that ships with the part
Every order ships with the appropriate combination of these documents based on industry and your quality flow-down. Redacted samples available on request.
AS9102
Customer-approved forms or system, characteristic map, measured results, and applicable material, process, and test evidence—defined from the released scope.
Request a sampleCMM
Zeiss-generated report: measured, nominal, tolerance, deviation, pass/fail per feature — fully indexed by characteristic.
Request a sampleMTR · Traceability
Mill cert with chemistry, mechanicals, and heat-lot reference — chained to drawing, FAI, and CoC.
Request a sampleCalibration
The equipment register and supporting records are being reconciled. Applicable current calibration or verification evidence can be reviewed after status is confirmed.
Discuss required recordsAIAG · L1–L5
PSW, Process Flow, FMEA, Control Plan, MSA, Capability Study — full AIAG submission for automotive and industrial programs.
Request a sampleQMS · Document Control
A draft lean AS9100D QMS is under implementation. Current documents are not represented as approved or operating until owner authorization and training are complete. NDA on request.
Request the manualOutside processing
Outside processing is quoted only after the required provider, site, process scope, customer approval or accreditation, and certificate requirements are verified for the specific order. No blanket accreditation claim is made.
Typical quoted scopes: heat treat, NDT, plating, anodize, passivation, coating, calibration, and other customer-specified processes.
Aging, solution, and stress-relief requirements can be quoted after provider scope and approval requirements are verified.
Liquid penetrant, magnetic-particle, and ultrasonic requirements can be quoted after provider scope is verified.
Type II / III anodize, chem film, and hard-coat requirements are confirmed from the drawing, PO, and approved-provider criteria.
Nickel, gold, silver, and electroless-plating requirements are verified for the specific order before release.
Specification, revision, method, provider approval, and certificate requirements are confirmed per order.
External calibration is arranged only after the required laboratory scope, accreditation, traceability, and reporting are verified for the equipment.
Open audit policy
Supplier qualification audits are welcome by arrangement. Submit only non-technical audit scope and NDA needs through the public form. If controlled data would be required, the workflow stops because controlled technical-data transfer is not currently authorized.
Quality FAQ
Procut-CNC is not currently certified to AS9100D, ISO 9001, or ISO 13485. AS9100D implementation is underway. No certification audit is currently scheduled.
ITAR/DDTC registration status is pending evidence review; Procut-CNC is not representing the shop as registered at this time. Controlled technical-data transfer and handling are not currently authorized. Use public forms only for contact and coarse commercial planning information, and do not email technical data.
Yes — on-site supplier audits are welcome by arrangement. Submit the audit scope and requested records through the supplier-qualification page so both teams can prepare.
AS9102C-format documentation can be quoted for aerospace work; customer-format FAI can be quoted for other programs. The characteristic map, CMM data, other inspection results, material/process/test evidence, forms, and review path are confirmed from the released requirements. Not every characteristic is appropriate for CMM verification. Use the buyer planning guide →
Yes — PPAP packages on automotive and industrial programs. Levels 1–5 supported, AIAG format.
Identifiers are provided only after current records are verified during supplier review.
Tell us what FAI / PPAP / NDT / traceability you need on RFQ — quote includes the doc package.