HomeSupplier Qualification

Procurement · Supplier quality · Compliance

Qualify the supplier before the program is late.

Request the facts your team needs for capability review, audit planning, vendor onboarding, or controlled-data setup without pretending you already have a released RFQ.

Current status

ITAR registered

Certification

Stage 1 planned

Processes

5-axis · Mill · Turn · Swiss

Procut-CNC is not yet AS9100D or ISO 9001 certified. Actual process fit, documentation, capacity, lead time, and commercial terms are confirmed for each program.

Start supplier review

Tell us what your approval process needs.

Use this form for commercial qualification context only. Do not include export-controlled drawings, models, specifications, or technical data.

Submitting this request does not establish supplier approval, guarantee capacity, or replace project-specific contract and quality review.

A cleaner supplier review

Separate public facts, controlled review, and quoted scope.

Procurement gets a useful answer faster when every item is routed to the right level of review.

Public packet

Available now

  • Machining processes and published work envelopes
  • Inspection equipment and material families
  • Industries served and shop contact details
  • Current certification and registration status
  • One-page supplier capability statement

Controlled review

Available by request

  • Quality manual and supplier-audit planning
  • Applicable calibration, training, and process evidence
  • CAGE, DUNS, and registration details
  • NDA and approved secure-transfer coordination
  • Commercial vendor-onboarding documents

Availability, access, and disclosure conditions are confirmed from the request scope.

Program specific

Defined with the RFQ

  • Feature-by-feature process capability and routing
  • Capacity, production cadence, and lead time
  • FAI, CMM, certificates, traceability, and PPAP scope
  • Outside processing, packaging, and flow-downs
  • Price, assumptions, terms, and change authority

Qualification sequence

From supplier search to an auditable sourcing decision.

01

State the review need

Tell us the supplier category, decision stage, and materials your process requires.

02

Confirm current status

We separate verified public facts from items requiring qualification or controlled access.

03

Plan the deeper review

When applicable, the teams coordinate NDA, secure transfer, supplier survey, or audit scope.

04

Validate the program

A released RFQ confirms actual capability, documentation, capacity, price, and schedule.

Supplier qualification FAQ

Answers procurement can use.

Are you AS9100D or ISO 9001 certified?

Not yet. Procut-CNC's quality system is aligned to AS9100D and ISO 9001 requirements, and the Stage 1 audit is planned. Certification is not represented as complete before certificate issuance.

Can we qualify Procut-CNC without a live RFQ?

Yes. Your team can review current supplier facts, quality-system materials, audit requirements, and onboarding needs before a part is released. Actual manufacturing capability, capacity, documentation, price, and schedule remain program specific.

Can we schedule a supplier audit?

Supplier audits are welcome by arrangement. Submit the requested audit scope, target date, and any survey or NDA requirement so both teams can confirm access and prepare the applicable records.

How should ITAR-controlled information be shared?

Do not place controlled technical data in this form or send it by ordinary email. Mark the request as ITAR-related and submit commercial context only; the team will coordinate an approved secure-transfer path before technical review.

Ready for supplier review

Give purchasing a documented next step.

Start with the qualification request. Move to the RFQ when your technical baseline is ready.

CallStart Review